The turn-key design and deployment of the Amorim Turismo Modular Data Center at the Casino de Tróia delivers an exceptionally secure, Tier III compliant technological hub. This facility is engineered to sustain uninterrupted gaming operations, data-intensive hospitality management systems, and high-volume transaction processing with zero-downtime tolerance.

Spanning an engineered structural footprint, this facility masterfully marries top-tier physical security with advanced mechanical and electrical plant systems. By pairing robust power-conditioning architectures with customized high-performance environmental control, Kinetix Critical has delivered a resilient, future-proof framework. This infrastructure perfectly matches the data protection requirements and continuous service philosophy expected by Amorim Turismo.

Our Scope of Responsibility & Execution

From the initial discovery phases to final handover, this project was managed as a comprehensive, full-lifecycle delivery. We oversaw everything from high-level architectural solution design and strategic financial engineering to strict on-site project management, ensuring that all milestone timelines, budget thresholds, and technical requirements were flawlessly achieved.

Requirements Gathering & Client Discovery
Vendor & Strategic Partner Procurement
Full-Scale Project Management (PM) Lifecycle
Custom Solution Architecture & Technical Design
Financial Modeling & Business Case Proposals
Strict Budget, Deadline, & Expectation Control

Deploying enterprise-grade infrastructure inside highly active industrial sites requires strict site coordination, absolute safety standards, and robust engineering timelines.

Working Process

How we structured the modular layout deployment to achieve certified Tier 3 metrics for Coca-Cola’s automated regional facility assets.

01
Step

Power Architecture & Racks

Integration of a high-performance APC by Schneider-Electric InfraStruXure system. Features a robust, modular power path grouping high-capacity UPS modules directly with mission-critical server rack envelopes to seamlessly absorb load fluctuations and prevent single-point failures.
02
Step

Thermal Management

Deployment of a specialized corporate Refrigeration and Air Conditioning System. Meticulously calibrated to deliver continuous, high-efficiency environmental zoning, removing localized hardware heat and safeguarding high-density digital operations.
03
Step

Electrical Distribution

Installation of low-voltage network and electrical switchboards. Purpose-built to handle complex power distribution paths, isolating critical equipment pipelines to guarantee seamless energy delivery across the entire IT architecture.
04
Step

Suppression & Monitoring

Integration of an automated IG55 gas fire detection and extinguishing clean-agent matrix. Linked to an enterprise-grade facility monitoring system for real-time, proactive visibility into all physical and ambient parameters.

Project Information

Turn-key engineering of a mission-critical infrastructure for premium hospitality and gaming operations.

Client Name

Amorim Turismo / Tróia Design Hotel & Casino

Category

Modular Data Center / Hospitality, Gaming & Entertainment Infrastructure

Implementation Time

March, 2010 - April 2010

Redundancy Typology

TIER III

KW | Budget

400kW | € 720.000,00

Location

Casino de Tróia, Carvalhal – Portugal