Coca-Cola facility engineering – Advanced critical infrastructure projects consulting.

Critical Electrical & Structural Systems Integration

Our turn-key execution of the Coca-Cola Refrige Modular Data Center sets a definitive benchmark for high-availability enterprise infrastructure. Kinetix Critical engineered a highly resilient, Tier 3 compliant environment designed to secure continuous facility availability, flawless structural risk mitigation, and robust power density for mission-critical bottling operations.

Since 2008, Kinetix Critical has bridged the gap between legacy industrial resilience and modern high-density data center architecture. By contrasting rigid physical safety parameters with dynamic, scalable power layouts, we provide multi-megawatt environments that maintain a 100% availability track record across Europe. Our structural and MEP engineering approach ensures that your infrastructure asset is not just deployed, but fully future-proofed.

Our Scope of Responsibility & Execution

From the initial discovery phases to final handover, this project was managed as a comprehensive, full-lifecycle delivery. We oversaw everything from high-level architectural solution design and strategic financial engineering to strict on-site project management, ensuring that all milestone timelines, budget thresholds, and technical requirements were flawlessly achieved.

Requirements Gathering & Client Discovery
Vendor & Strategic Partner Procurement
Full-Scale Project Management (PM) Lifecycle
Custom Solution Architecture & Technical Design
Financial Modeling & Business Case Proposals
Strict Budget, Deadline, & Expectation Control

Deploying enterprise-grade infrastructure inside highly active industrial sites requires strict site coordination, absolute safety standards, and robust engineering timelines.

Working Process

How we structured the modular layout deployment to achieve certified Tier 3 metrics for Coca-Cola’s automated regional facility assets.

01
Step

Power Generation & UPS

Integration of premium APC by Schneider-Electric UPS architectures and high-density rack matrices configured to support strict Tier 3 continuous runtime thresholds and seamless power transitions.
02
Step

Climate & Thermal Control

Deployment of dedicated close-control refrigeration and high-efficiency HVAC air conditioning systems, optimizing internal airflow dynamics to completely eliminate hot-spots across the active whitespace.
03
Step

Structural & Life Safety

Construction of an engineering-grade modular envelope utilizing certified 120-minute fire-retardant structural panels, integrated anti-static raised flooring systems, and automated Argon gas fire detection and suppression matrices.
04
Step

System Integration

Comprehensive turnkey project delivery, synchronizing continuous remote facility monitoring networks and structured cabling arrays to ensure structural systems remain fully optimized and responsive.

Project Information

Complete delivery of a turn-key Data Centre solution

Client Name

Coca-Cola Refrige

Category

Enterprise Data Center / Industrial Infrastructure

Implementation Time

May, 2008 - July 2008

Redundancy Typology

TIER III

KW | Budget

350kW | € 450.000,00

Location

Quinta da Salmoura, Cabanas, Palmela
Portugal